A) Features and Benefits:
• Direct Membrane Termination To A Vertical Wall
B) Detail Drawings by Name:
• DTD Concrete Deck 1: Direct Reinforced Membrane Air Seal
Termination to Structural Concrete Deck (140 MPH)
• DTD Concrete Deck 2: Direct Membrane Termination
• DTD Concrete Deck 3: Direct to Deck, Air Seal and Water Dam
• DTD Concrete Deck 4: Direct to Deck, Air Seal and Water Dam
• DTD Concrete Deck 5: Direct to Deck Termination Air Seal (100 MPH)
• DTD Concrete Deck 6: Direct to Deck, Air Seal and Water Dam (150
MPH)
• DTD Concrete Deck 7: Non Fastenable Wall Air Seal Reinforced
Shear Skirt Fastened to Deck
• DTD Concrete Deck 8: Retrofit Air Seal Termination Of A New Curb
Installed w/o An Air Seal On An Existing 2001 Vented Roof Assembly
Shear Skirt Direct To Deck Air Seal
• DTD Concrete Deck 9: Retrofit Air Seal Termination Of A New Curb
Installed w/o An Air Seal On An Existing 2001 Vented Roof Assembly
Shear Skirt Direct To Deck Air Seal
• DTD Concrete Deck 10: Retrofit Air Seal Termination Of A New Curb
Installed w/o An Air Seal On An Existing 2001 Vented Roof Assembly
Shear Skirt Direct To Deck Air Seal
• DTD Concrete Deck 11: Retrofit Air Seal Termination Of A New Curb
Installed w/o An Air Seal On An Existing 2001 Vented Roof Assembly
Shear Skirt Direct To Deck Air Seal