4. Shear Skirt Air Seal Details (80 Mph)

A) Features and Benefits:

     •    Shear Skirt Field Membrane Terminations with Deck
to Base Air Seal Membrane

B) Detail Drawings Gallery:A Gallery of all Detail Drawings

C) Detail Drawings by Name:

      Shear Skirt Angle Change Termination…to Air Seal the Wall to The 
       Existing Roof Membrane On Non Fastenable Air Permeable Roof Decks
       For Curbs and Perimeters Under 30in. High 2ft Two Foot Shear Skirt.

     •    2FT-CEPDM-SS-CU Layout1:    Using Reinforced C-EPDM

    •    2FT-CEPDM-SS-CU-NR Layout1:   Using Non-Reinforced C- 
EPDM

     •    2FT-TPO-SS-CU Layout1:    With TPO or PVC Used

      Shear Skirt Angle Change Termination … To Air Seal the Wall to the 
       Existing Roof Membrane On Non-Fastenable Air Permeable Roof Decks
       For Curbs and Perimeters Under 30′ High 3′ 4″ Shear Skirt.

     •    3FT-CEPDM-SS-CU Layout1:   Using Reinforced C-EPDM

     •    3FT-CEPDM-SS-CU-NR Layout1:  Using Non-Reinforced C-
EPDM

     •    3FT-TPO-SS-CU Layout1:Using TPO or PVC

     Shear Skirt Perimeter Gravel Stop Termination on Non-Fastenable Air  
      Permeable Roof Decks Used To Air Seal the Wall to the Existing Roof  
      Membrane.

     •    GS-CEPDM-SS Layout1:Using Reinforced C-EPDM

     •    GS-CEPDM-SS-NR Layout1:Using Non-Reinforced C-EPDM

     •    GS-TPO-SS Layout1:Using TPO or PCV

     Preflashed Shear Skirt Angle Change Termination …To Air Seal the Wall
      to the Existing Roof Membrane On Non-Fastenable Air Permeable Roof 
      Decks For Curbs and Perimeters Over 30ft. High 3ft. 4in. Shear Skirt.

     •    PREF-CEPDM-SS-CU Layout1:Using Reinforced C-EPDM

     •    PREF-CEPDM-SS-CU-NR Layout1:With Non Reinforced
C-EPDM Used

     •    PREF-TPO-SS-CU Layout1: With TPO or PVC Used

    Reverse Ballasted Shear Skirt Angle Change Termination…To Air Seal the 
     Wall to the Existing Roof Membrane On Non-Fastenable Air Permeable 
     Roof Decks For Curbs and Perimeters Over 30ft. High 2ft. Two Foot Shear 
     Skirt.

     •    RB-2FT-CEPDM-SS-CU Layout1:Using Reinforced C- EPDM

     •    RB-2FT-CEPDM-SS-CU-NR Layout1:Using Non-Reinforced
C-EPDM

     •    RB-2FT-TPO-SS-CU Layout1:Using TPO or PVC

     Reverse Ballasted Shear Skirt Angle Change Termination…To Air Seal 
      the Wall to The Existing Roof Membrane On Non-Fastenable Air 
      Permeable Roof Decks For Curbs and Perimeters Over 30ft. High 3ft. 4in. 
      Shear Skirt.

     •    RB-3FT-CEPDM-SS-CU Layout1:Using Reinforced C-EPDM

     •    RB-3FT-CEPDM-SS-CU-NR Layout1:Using Non-Reinforced
C-EPDM

     •    RB-3FT-TPO-SS-CU Layout1:Using TPO or PVC

     Reverse Ballasted Shear Skirt Perimeter Gravel Stop Termination on Non- 
     Fastenable Air Permeable Roof Decks To Air Seal The Wall to the Existing 
     Roof Membrane.

     •    RB-GS-CEPDM-SS Layout1:Using Reinforced C-EPDM

     •    RB-GS-CEPDM-SS-NR Layout1:With Non-Reinforced C-
EPDM Used
     •    RB-GS-TPO-SS Layout1:With TPO or PVC Used

    Reverse Ballasted Preflashed Shear Skirt Angle Change Termination To  
     Air Seal the Wall To The Existing Roof Membrane On Non-Fastenable Air 
     Permeable Roof Decks For Curbs and Perimeters Over 30ft. High 3ft. 4in. 
     Shear Skirt.

     •    RB-PREF-CEPDM-SS-CU Layout1:With Reinforced C-
EPDM

     •    RB-PREF-CEPDM-SS-CU-NR Layout1:With Non-
Reinforced C-EPDM

     •    RB-PREF-TPO-SS-CU Layout1: With TPO or PVC Used

     Reverse Ballasted Shear Skirt Perimeter Gravel Stop Termination On Non 
      Fastenable Air Permeable Roof Decks Used To Air Seal The Wall To The
      Existing Roof Membrane

     •    RB-RGS-CEPDM-SS Layout1:With Reinforced C-EPDM

     •    RB-RGS-CEPDM-SS-NR Layout1:With Non-Reinforced C-
EPDM

     •    RB-RGS-TPO-SS Layout1:With TPO Used

     Shear Skirt Perimeter Gravel Stop Termination On Non-Fastenable Air 
     Permeable Roof Decks To Air Seal The Wall To The Existing Roof 
     Membrane.

     •   RGS-CEPDM-SS Layout1: Using Reinforced C-EPDM

     •   RGS-CEPDM-SS-NR Layout1:   Using Non-Reinforced C-
         EPDM    (Info Upon Request)

     •   RGS-TPO-SS Layout1:   Using TPO  (Info Upon Request)

     •   SS- 01 Layout1:Raised Gravel Stop Adhered Shear Skirt to
Existing Smooth Surface Shear Skirt on a Raised Gravel Stop (80 MPH)

     •   SS- 02 Layout1:Raised Gravel Stop Adhered Shear Skirt
Under Compression to Existing Smooth Surface Shear Skirt on a    
Raised Gravel Stop (80 MPH)

     •   SS- 03 Layout1:Raised Gravel Stop Adhered Shear Skirt

     •   SS- 04 Model:Reinforced Shear Skirt on Non-Fastenable Deck

     •   SS- 05 Model:Pre-Flashing of Perimeter and Penetrations with Air
Seal

     •   SS- 06 Model:Non Fastenable Decks Shear Skirt Rnf Mem. 3ft.  
4in. Perimeter 2ft. Penetrations

     •   SS- 07 Layout1:C-EPDM Shear Skirt Fastened into VerticalWall 
(80 MPH)

     •   SS- 08 Layout1:TPO Shear Skirt Fastened into Vertical Wall (80 
MPH)

     •   SS- 09 Layout1:For Non Fastenable Wall Air Seal with Floating 
Cricket (100 MPH)

     •   SS- 10 Layout1:2001 Company Perimeter Edge Detail At 
Cricket Locations

     •   SS- 11 Layout1:Non Fastenable Wall Air Seal Reinforced Shear 
Skirt Fastened to Deck

     •   SS- 12 Layout1:C-EPDM 55 MPH Wind Rider

     •   SS- 13 Layout1:.060 Mil Reinforced C-EPDM Shear Skirt (80 
MPH)

     •   SS- 14 Layout1:.060 Mil Reinforced C-EPDM Shear Skirt – Wind 
Rider 1 (100 MPH)
     •   SS- 15 Layout1:.060 Mil Reinforced C-EPDM Shear Skirt – Wind
Rider 2 (100 MPH)

     •   SS- 16 Layout1:Hurricane Vert Wall Shear Skirt or Direct 
Reinforced Vertical Wall Membrane Termination (80 MPH)

     •   SS- 17 Layout1:Backwrap Shear Skirt Detail for Expansion Joint
at Angle Change (70 MPH)


D) Written Specifications:

Shear Skirt Roof System

Summary Specification 2001 Co. Re-roof Over Two Existing 
Roofs on a Monolithic Concrete Deck With Shear Skirts Up
to 100MPH Wind Rider*

Installation Pictures:

How to Reroof Without One Fastener In A Tectum Deck