Each link below will open Adobe Acrobat in your browser to view the file. If you want to download the file, right click on the link and “Save As”.
Glossary of 2001 Co. Terms
01 General Requirements
01.01 – Patented Air Seal Method and Deck Requirement
01.02 – 2001 Co. Product Approvals
01.03 – 2001 Co. General Air Seal Installation Requirements
01.04 – 2001 Co. General EPDM Installation Requirements
01.05 – 2001 Co. General Thermoplastic Requirements
02 Compression Board
02.01 – Compression Board Air Seal Introduction
02.02 – Compression Board Sample Specification
02.03 – Compression Board Photos
03 Hurricane Back Wrap
03.01 – 2001 Co. Hurricane Back Wrap Air Seal Introduction
03.02 – 2001 Co. Hurricane Back Wrap Sample Specification
03.04 – 2001 Co. Hurricane Back Wrap Pictures
04 Direct Membrane
04.01 – Direct Membrane Air Seal Introduction
04.02 – Direct Membrane Introduction
04.03 – 80 MPH Direct Termination Sample Specification
04.04 – Direct Membrane to Deck Introduction
04.05 – 100 MPH Direct to Deck Termination Sample Specification
04.06 – Direct Membrane to Poured-In-Place Concrete Deck Introduction
04.07 – 150 MPH Direct-to-Deck Termination Sample Specification
04.08 – Direct Membrane Pictures-s
05 Shear Skirt
05.01 – Shear Skirt Introduction
05.02 – Shear Skirt Sample Specification
05.03 – Shear Skirt Pictures-s
06 Upside-Down Cover Tape
06.01 – Upside-Down Cover Tape Introduction
06.02 – Upside-Down Cover Tape (RPS) Sample Specification
06.03 – Upside-Down Cover Tape Instructions R3-20
6.04 – 2001 Large Sheet Technique Upside Down Tape2
07 Reverse Ballasted
07.01 – Reverse Ballasted Introduction
07.02 – Reverse Ballasted Concrete or Air Sealed Deck Sample Specification
07.03 – Reverse Ballasted Metal Air Permeable Deck Sample Specification
07.04 – Reverse Ballasted Pictures-s
08 Re-Skinning
08.01 – Re-Skinning Introduction
08.02 – Re-Skinning Sample Specification
08.03 – Re-Skinning Pictures-s
09 Re-Skinning Conventional
09.01 – Re-Skinning Conventional Introduction
09.02 – Thermoplastic Re-Skinning Conventional Sample Specification
09.03 – EPDM Re-Skinning Conventional Sample Specification
09.04 – Re-Skinning Conventional Pictures-s
10 Self-Dry Permeation
10.01 – Self Dry Permeation Introduction
10.02 – How To Dry Out A Wet Roof
10.03 – UL TGIK.R9734 Roofing Systems. Uplift Resistance
10.04 – B1456 4 Feburary 04 2013 Test results
10.05 – Deer Ridge Consulting; 3rd Roof (Code Compliance Research Report)
10.06 – 2011_12_05 ks Dec Newsletter (IBC Newsletter)-s
10.07 – Self Drying Permeation Sample Specification
10.08 – Self Dry Permeation Pictures
11 Accelerated Forced Air Drying
11.01 Accelerated Forced Air Drying Introduction
11.02 Accelerated Force Air Substrate Drying Sample Specification
11.03 Accelerated Force Air Substrate Drying Pictures2
12 Wind Vented Walls
12.01 – Wind Vented Wall Systems Introduction
12.02 – Wall Drying Sample Specification
12.03 – North Constitution Hoboken NJ Venting Vertical Wall
12.04 – Roosevelt Mall Pictures
13 Warranty Procedures
13.01 – Warranty Procedure; Contractors 01.23.15
14 Seam Tape
14.01 – 2001 Co Seam tape Installation Instructions
15 Uncured Flashing
15.01 – Installation Instructions for Uncured Flashing and Cured Cover Tape