Each link below will open Adobe Acrobat in your browser to view the file. If you want to download
the file, right click on the link and "Save As".


Chapter 1 - Existing Wet Roof Substrate Drying:

1.0 How To Dry A Wet Roof Booklet

1.1 W.U.F.I.: How to Determine How Long Your Wet Roof Will Take To Dry (Coming Soon!)
W.U.F.I. Details (Coming Soon!)
W.U.F.I. Samples (Coming Soon!)

1.2 Magazine Articles:
Roofing Contractor - April 2001
Roofing Contractor - May 2003
RCI - The Exxon Headquarters (Coming Soon!)

1.3 Patented Roof Drying Explanation
1.4 Wind Uplift Low Pressure Transfer Wet Roof Drying Technique (Coming Soon!)
1.5 Wet Roof Drying Rider (Sample)
1.6 Canadian Testing Verifying Drying of Wet Roofs


Chapter 2 - Patented Vertical Wall Venting and Drying:

2.0 Patent Write Up (Coming Soon!)
2.1 Roosevelt Mall, R1 PA (Coming Soon!)
2.2 Monmouth County Courthouse, NJ (Coming Soon!)
2.2 Vented Wall Details


Chapter 3 - How to Design Hurricane and Tornado Proof Roofs:

3.0 2001 Newsletter, April 2005
3.1 DeSoto Schools Hurricane Damage, May 2003
3.2 The Shoulder, Spanish Fort, AL. post Hurricane Katrina, August 2005
3.3 Miami Airport, 1989
3.4 Tom Kelly Investigation - Hurricane Ivan 2004
3.5 2001 Co Building Windflow Charts
3.6 Peak Pressure Coefficient
3.7 U of WI Wind Vented Roof System
3.8 2001 Company ASCE-7 Wind Codes
3.9 ASCE-7 Naval Weapons Station (Sample)
3.10 Understanding the ASCE-7 Wind Code
3.11 Hurricane Backwrap Detail

3.12 ASCE 7-98 Revised Wind Maps of the United States
         ASCE 7-98 Wind Map of the United States
         ASCE 7-98 Eastern United States
         ASCE 7-98 West Coast United States
         ASCE 7-98 Mid & Northern United States
         ASCE 7-98 Southeastern United States
         ASCE 7-98 Texas Panhandle Area

3.13 Wind Blown Debris Damage
        Wind Blown Debris Rider SAMPLE
              The Texas Tech “Wind Blown Debris Test”: Hurricane 140 Mph & Tornado 250 Mph


Chapter 4 - Low VOC Solvents:

4.0 Low VOC Solvents Applicator Bulletin and State List
4.1 Products (Coming Soon!)
4.2 MSDS (Coming Soon!)


Chapter 5 - Fireguard Nylon Gravel Mat:

5.1 Fireguard Nylon Gravel Mat


Chapter 6 - Slow Rise Adhesive Foam:

6.0 Spraying Tech: Dollar Store, Hazlet, NJ
6.1 Re-Roofing with Slow Rise Foam and EPS
6.2 Speed of Application
6.3 2001 Company System Roof Drying Verification (Coming Soon!)
6.4 Adhesive Foam Details


Chapter 7 - C Channel Details:

7.0 Spring Flange and C-Channel Details
7.1 Kellycrete Details


Chapter 8 - Upside Down Cover Tape Application:

8.0 Upside Down Reinforced Tape
8.1 Installation Details (Coming Soon!)


Chapter 9 - 50 Year Sustainable Roofs:

9.0 50 Year Sustainable Roof Designs
9.1 50 Year Sustainable Roof Details
9.2 Hail Damage Rider for 90+ mil C-EPDM

Copyright © [1974-2015] [2001 Company, Inc.] All rights reserved | Privacy Policy